910-946-5512Sign InStart Your Project
Decks · Coastal NC

Deck building and replacement

We build new decks and replace worn ones on the North Carolina coast. We also put new boards and rails on a sound frame. We work in Brunswick, New Hanover and Pender Counties, from our home base in Southport.

A deck extension in progress: new pressure-treated decking and posts meet the weathered boards of the existing deck against a shingle-sided house.

Send the address. We'll look up where a deck can go on your lot, and what the code asks of it there.

Give us a phone number or an email. Either one works.

We read every address and reply by phone or email.

No site visit, no obligation.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

What you get with a new deck.

Sealed where it meets the house.

A deck bolted to a framed wall can let water in behind it. The code answers with flashing or a treated band at that joint. We bolt the deck on by the state's table for your kind of wall, brick included.

Hardware picked for salt air.

Salt eats the bolts and hangers that hold a deck up. It can work fastest under the deck, where rain never rinses the metal. On the islands, the code asks for hot-dip galvanized steel. Stainless steel is an upgrade you can choose.

We know what the water side allows.

Near the ocean or a marsh, the state's coastal rules keep most building back from the water. A small open deck is on the short list allowed closer, up to a size cap. We look up the limit for your lot.

Your deck can be the whole project.

A new deck, a new frame under an old one, or new boards and rails: we take each one on.

Tell us how big a deck you picture and how high it sits. From the address alone, we can look up your town's deck rules and any coastal line on the lot.

Four kinds of deck job

Deck on the house

Joined to the house along one band, sealed against water, and carried on posts and footings.

Freestanding deck

Stands on posts, with no joint at the house wall. Once its floor sits more than 30 inches up, it gets bracing.

New frame

New joists, beams, posts and footings under a deck that has worn out, built to today's code under a permit.

New boards and rails

New decking, rails, pickets and stair treads on a frame that is still sound.

The choices are yours.

  • The size, the shape and how high the deck sits
  • Joined to the house, or freestanding
  • Wood or composite boards
  • The style of the rails
  • Where the stairs land
  • Hot-dip galvanized hardware, or a stainless steel upgrade
  • Lights or outlets, wired under an electrical permit
  • A hot tub, on a frame and footings designed for it

Some choices bring rules with them. A deck floor more than 30 inches up gets a guard rail. A taller deck gets bracing. A hot tub calls for a frame and footings designed for its full weight. Your choices, and the reason for each, go into your private online workspace.

How a new deck goes up

A new deck is designed and permitted first, by our six steps. Then it goes up in this order.

Clear the wall

Any old deck comes off, and so does the siding where the new ledger will sit. The code keeps siding out from behind it.

Footings and posts

A footing goes in under each post, at least 12 inches below grade.

Flash and bolt the ledger

On a framed wall, the joint gets flashing or a treated band. The ledger is bolted on by the table for your wall.

Frame and brace

Beams and joists go up, with braces wherever the deck's height calls for them.

Lay the boards

Wood or composite boards go down, fastened with hardware picked for salt air.

Rails and stairs

Guards, stairs and handrails go on, built to the state's numbers.

Final inspection

The inspector makes a final inspection of the permitted work.

Damage under old boards is priced as an allowance.

Pulling up old boards, or taking an old deck off the house, can uncover rot in the frame or the wall behind it. Damage that only shows then is carried as an allowance in the price. Where the house wall itself needs work, siding and envelope replacement covers it.

Add a roof, and it becomes a porch.

A deck stays open to the sky. Put a roof over it, and it becomes a covered porch, with a roof tied down for the wind. Close it in with glass, and it becomes a sunroom. Thinking of a roof later? Say so at the start, since a roofed deck takes its beams and joists from other tables.

Start with the deck you picture.

Tell us where the house is and the deck you have in mind. We'll start with the rules for a deck at that address.

Start Your Project
Wide Tropical Tides wordmark and architectural house illustration on a calm editorial background.