910-946-5512Sign InStart Your Project
Kure Beach, New Hanover County, North Carolina

Custom home builder in Kure Beach, North Carolina.

The pier at Kure Beach running out past the breakers, with the surf blurred white by a long exposure under streaked clouds.

Send the address. We'll tell you how high the floor must sit, and how much house fits under the 35-foot cap.

Give us a phone number or an email. Either one works.

We read every address and reply by phone or email.

No site visit, no obligation.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

  • A ferry ride from Southport.

    Southport is our home base. The NCDOT ferry takes about 35 minutes. By road through Wilmington, it's about 70 minutes.

  • We find where your view opens.

    The town caps every house at thirty-five feet. Before we draw, our written site analysis maps where your view clears the roofs next door.

  • Built for the island's end.

    With open water on two sides, we pursue FORTIFIED Gold here. Our air-leak target is under 1.0 ACH50, tested before handover.

Here's what Kure Beach decides for your lot.

We build new homes and remodel existing ones in Kure Beach, from our home base in Southport.

  • Where the map sets a flood height, the house must sit one foot above it.
  • The 35-foot height cap can be measured from the top of the slab at the front entry.
  • Outside the B-1 and fire districts, buildings and paving can take up to 65 percent of the lot.
At a glance
County
New Hanover County
Jurisdiction
Town of Kure Beach: the town zones and permits its own land under the Kure Beach Code
Ultimate design wind speed
150 mph on every lot in town (2018 NC Residential Code)
From Southport
About 35 minutes by NCDOT ferry, or about 70 minutes by road through Wilmington (about 45 miles)
Flood maps
FEMA Flood Map Service Center and the NC Flood Risk Information System, read for the parcel

Residential Contractor License #109520 ยท Member, Brunswick County Home Builders Association

Explore further

Tell us about your Kure Beach site.

Every project begins with a formal site analysis of your specific parcel: flood zone, wind exposure, sun path, drainage, and the constraints that come with it. That document is yours, and it comes before any design decision.

Start Your Project