910-946-5512Sign InStart Your Project
Topsail Beach, Pender County, North Carolina

Custom home builder in Topsail Beach, North Carolina.

Send the address. We'll tell you how much house the setback, flood and zoning rules leave room for.

Give us a phone number or an email. Either one works.

We read every address and reply by phone or email.

No site visit, no obligation.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

  • About 100 minutes from Southport.

    Southport is our home base, about 71 miles away. The drive runs up US 17, over the Surf City bridge and down the island.

  • We find what the rules leave.

    The setback, the flood elevation and zoning each take a share of your lot. Before we draw, our written site analysis maps what remains.

  • Wind here crosses open water.

    So every home we design here pursues FORTIFIED Gold, checked by an independent evaluator. Our air-leak target is under 1.0 ACH50, tested before handover.

Here's what Topsail Beach decides for your lot.

We build new homes and remodel existing ones in Topsail Beach, from our home base in Southport.

  • Height is capped at 38 feet from the ground, plus up to three feet where freeboard applies.
  • The house and all hard surfaces can cover 35 percent of the lot.
  • In a flood zone, a remodel that costs half the house's value in a year brings in the flood rules.
At a glance
County
Pender County
Jurisdiction
The town's own Code of Ordinances; the county UDO governs unincorporated Pender land
Design wind speed
150 mph across the whole town (2018 NC Residential Code)
Regulatory flood protection elevation
Base flood elevation plus three feet of freeboard, where a BFE is mapped
Drive from Southport
About 71 miles, roughly 100 minutes: US 17, NC 50/210 over the Surf City bridge, then NC 50 down the island

Residential Contractor License #109520 · Member, Brunswick County Home Builders Association

Explore further
References

Regulatory and geographic statements on this page draw on the public sources below. Ordinances change; the parcel and the current adopted code decide, and the formal site analysis is where that gets confirmed for your lot.

Tell us about your Topsail Beach site.

Every project begins with a formal site analysis of your specific parcel: flood zone, wind exposure, sun path, drainage, and the constraints that come with it. That document is yours, and it comes before any design decision.

Start Your Project