Whole-house renovation on the North Carolina coast
We open up older coastal houses and rebuild them inside. That can mean a new layout, new wiring and plumbing, new heating and cooling, and new walls and floors. In a flood zone, a job this big is counted against the town's flood line. So we check that line before design starts. We work in Brunswick, New Hanover and Pender Counties.
What you get with a whole-house plan.
We plan the work around you.
A house gutted to the studs can't be lived in during the work. A smaller job can be staged so the rooms you rely on stay usable.
We fix it while the walls are open.
Open walls make old wiring, pipes, ducts and air leaks easy to reach. What we touch meets today's code. Damage that only shows once the walls are open is carried as an allowance in the price.
One plan for the whole house.
The layout, the systems and the finish are drawn as one job. You keep the drawings. Each choice goes in your private online workspace with its reason.
We plan the whole house before a wall comes out.
A whole-house job can be new finishes throughout, new systems and finishes, or a gut to the studs with a new layout. Whatever its size, the plan starts with the house as it stands.
The assessment writes down the frame, the walls and roof, and the wiring, plumbing and heating and cooling. In a flood zone, it also notes your town's flood rule and how long it counts the work. We ask what was done to the house in that time, since that work can count too.
Send the address. We'll look up your town's flood line and how long it counts the work.
The job, step by step
Assess the house
We write down the frame, the shell and the systems as they stand.
Check the flood rule
In a flood zone, we add up the whole scope and set it against your town's rule.
Draw and permit
The layout and the systems are drawn, priced and permitted.
Open to the studs
For a gut, the finishes come off down to the frame.
Frame and rough in
Walls, beams and bracing go in, then new wiring, pipes and ducts.
Insulate and close
Opened cavities in the shell are insulated before the drywall goes up.
Inspect and finish
The final inspection comes first, then the certificate of compliance. After a gut, that is when you move back in.
What the walls hide is an allowance.
Some damage only shows once the walls are open. That damage is carried as an allowance in the price.
The choices are yours.
- The layout, and which walls move
- Which systems are replaced
- The kitchen and the baths
- Whether impact windows and doors join the job
- Whether new siding, and maybe a roof, join it too
- Whether to seal the house to an airtightness target, checked by a blower-door test
Design is its own step, and you keep the drawings. Each decision goes into your private online workspace with the reason behind it. A tighter house needs fresh air brought in on purpose, and airtightness without stuffy interiors explains how.
Plan to move out for a gut.
A house gutted to the studs cannot be lived in during the work. You move back in once the final inspection passes and the inspector issues a certificate of compliance. If part of the house is ready and safe sooner, the inspector can issue a temporary certificate for that part.
A smaller job can be staged around you, with the rooms you rely on kept usable. Living through a renovation covers how that works.
In a flood zone, the town counts the whole job.
In a mapped flood zone, the flood rule weighs the cost of the work against the building's market value. The count takes in nearly everything a whole-house job replaces. Crossing the line is uncommon, and we add up your job before design starts.
- The test
- The cost of the work, set against the building's market value before the work starts
- What counts
- Nearly all of it: materials, labor (yours too), demolition, framing, finishes, cabinets, systems, code upgrades, overhead and profit
- Market value
- The building alone, without the land, set by appraisal, depreciated replacement cost or adjusted tax value
- The line
- 50 percent of market value, or 49 percent in Carolina Beach
- How long it counts
- Many towns: any one year. Holden Beach: any two years. New Hanover County (outside its towns), Burgaw and Boiling Spring Lakes: five. Wilmington: the job plus repairs and reconstruction from the five years before it
- Who decides
- The local floodplain administrator, when the building permit is reviewed
On an older, low house, the value of the building can be modest next to the cost of opening it up. That is why we add up the whole job and place it against your town's line before design starts.
What the town adds up
Federal guidance for local officials lists what counts. Materials and labor count, including the going rate for work you do yourself. So do demolition, framing, drywall, floors, cabinets, insulation, wiring, plumbing, heating and cooling, and the contractor's overhead and profit. Plans, the survey, permit fees, landscaping and detached buildings such as a shed can be left out of the count.
Bringing an old house up to today's code counts in full. Code work comes out of the count only for a violation a code official has identified, fixed to the minimum needed for safe living.
Your town sets the window.
Many towns count the work over any one year, among them Southport, Oak Island and Leland. Holden Beach counts any two years, starting from the first improvement or repair. New Hanover County counts five years outside its towns, and so do Burgaw and Boiling Spring Lakes. Wilmington adds the repairs and reconstruction from the five years before the job. Carolina Beach counts one year and draws its line at 49 percent. The town-by-town table lists each rule.
Earlier work can count too.
Splitting the job into phases or separate permits leaves the count the same. Federal guidance has the town make its call before the first permit, counting all of the work. A roof replaced inside your town's window counts along with the new job. So do storm repairs.
If the job crosses the line
Crossing the line is uncommon, and the house may still be fine. Past it, the whole house has to meet the flood rules for a new house. Today's flood height is the map's flood level plus the margin your town adds. If the house already sits at that height, the job goes ahead much as planned. Its new wiring, ducts and equipment go at or above that height, and enclosed space below stays for parking, access or storage. A low house has to be brought up to that height. When replacing the house makes more sense, building new is the other path.
Outside a flood zone
Outside a mapped flood zone, the building code decides on its own. What the code asks covers it.
What the work touches meets today's code.
New work meets the rules for a new house, and the parts the job leaves alone can stay as built. A gut touches most of the house, so most of it comes up to today's rules.
Section R102.7.1 of the 2018 North Carolina Residential Code sets that rule. It also bars work that would make the house unsafe or hurt how it performs.
A whole-house job needs a permit.
State law lets some work of $40,000 or less, done to code, go ahead without a building permit. A whole-house job usually falls outside that in three ways. It changes the design of the plumbing, the wiring or the heating and cooling. It usually touches load-bearing framing. And it almost always costs more than $40,000.
Taking out walls
Some inside walls hold up the floor or roof above them. Others brace the house against wind pushing sideways. Before one comes out, the beam or bracing that takes over its work is sized and permitted. Every lot in our three counties falls under the code's high-wind design rules (Section R301.2.1.1), and the new layout is braced to them.
Opened walls get insulated.
The shell of the house is its outside walls, the ceiling under the attic and any floor over a crawl space, garage or open air. Every cavity the job opens in the shell is filled with insulation before it closes. New or rebuilt parts of the shell meet the energy code for a new house (Section N1109). With the framing bare, the seams where air leaks in are easy to seal as well.
Heating and cooling sized to the house
The code sizes new heating and cooling equipment from a load calculation for the house (Section M1401.3). A gut changes that load, since new insulation and sealed seams tend to shrink it. So the load is figured for the house as it will be, and new ducts are sealed at every joint and seam. Right-sized systems explains why the right size keeps a coastal house drier.
Smoke and carbon monoxide alarms
A permitted whole-house job brings the smoke alarms up to the rules for a new house. That means one in each bedroom, one outside each sleeping area and one on every level. Once wall and ceiling finishes come off, the alarms are linked, so one sets off all of them. Carbon monoxide alarms follow the same rule where the house has a fuel-burning appliance or fireplace, or an attached garage that opens into it.
Wiring
New and changed wiring meets the North Carolina Electrical Code. How much of the old wiring to replace is decided with you, once the walls are open and the wiring can be seen.
A new bedroom needs a way out.
Every bedroom needs a window or door big enough to escape through in an emergency (Section R310.1). A room re-planned as a bedroom picks up that rule, along with its own smoke alarm. On a septic lot, a new bedroom also changes what the system has to carry. Older houses covers that step.
An older house comes with its own rules.
The year the house was built can change which rules apply. So can its paint and old materials, its septic system and a historic district.
Older than the flood map
A house begun before its town's first flood rate map is called pre-FIRM. Many older houses here sit lower than a new house would today. A pre-FIRM house can stay as built while the work stays under the town's line. Wilmington dates its first map to April 17, 1978, and Leland to October 19, 1992. On Oak Island, the date turns on which town or county the lot belonged to before the 1999 merger.
Paint and old materials
Paid work that disturbs paint in a house built before 1978 falls under North Carolina's lead-safe renovation rules. Old flooring and its adhesive, joint compound and ceiling texture can hold asbestos. On an older house, those materials are tested by an NC-accredited inspector before demolition.
Septic lots and new bedrooms
On a septic lot, in places like Winnabow and Boiling Spring Lakes, the state's wastewater rules size the system by its bedrooms. A new bathroom on its own leaves that size where it was. An added bedroom goes to county environmental health before framing. A job that adds no bedroom can use the state's existing-system affidavit at the permit.
Historic districts
In Southport's local historic district, all exterior work needs a certificate of appropriateness before the building permit. In Wilmington, exterior work in a local historic district goes to the Historic Preservation Commission first. Under state law, the commission has no say over the layout inside.
The flood rule has its own historic exception, and age alone leaves a house under the rule. The exception covers a house the National Register or a certified local program lists as historic, when the work keeps that listing. Southport, Holden Beach, Oak Island and Burgaw also require a variance. Older houses on our renovation page goes further.
When the zoning has moved on
Some older houses sit closer to a lot line than today's zoning allows. In Carolina Beach, repairs to such a house worth more than half its tax or appraised value bring two more rules. The house has to meet the setbacks from lot lines away from the street, and the town's parking minimum.
Questions about whole-house renovation
- Do I need a permit to renovate my whole house?
- Yes. State law lets some work of $40,000 or less, done to code, go ahead without a permit. A whole-house job falls outside that. It usually changes the design of the plumbing, wiring or heating and cooling, and it often touches load-bearing framing. At the end, the inspector makes a final inspection and issues a certificate of compliance.
- What counts toward the 50 percent flood rule?
- In a mapped flood zone, nearly the whole job counts. That means materials, labor (yours too, at the going rate), demolition, framing, finishes, cabinets, systems, code upgrades, and the contractor's overhead and profit. Plans, the survey, permit fees, landscaping and detached buildings can be left out. The cost is set against the market value of the building alone, by appraisal, depreciated replacement cost or adjusted tax value.
- Does my town count one year of work, or five?
- It depends on the town. Many count any one year, including Southport, Oak Island and Leland. Holden Beach counts any two years. New Hanover County counts five outside its towns, and so do Burgaw and Boiling Spring Lakes. Wilmington adds the repairs and reconstruction from the five years before the job. Carolina Beach counts one year and draws its line at 49 percent.
- Will a whole-house renovation make me raise my house?
- Only in a mapped flood zone, and only if the job crosses your town's line. That is uncommon. If the house already sits at today's flood height, the job goes ahead much as planned. A low house past the line has to be brought up to that height, and then building new can make more sense. We add up the job before design starts, so you know early.
- Does gutting the house mean everything has to meet today's code?
- What the work touches does. North Carolina's residential code holds new work to the rules for a new house, and the parts the job leaves alone can stay as built. A gut touches most of the house, so most of it comes up to date. Opened cavities in the outside walls, the attic ceiling and floors over a crawl space, garage or open air get insulated. The smoke alarms are brought up to the rules for a new house.
- Do I have to rewire the whole house?
- New and changed wiring meets the North Carolina Electrical Code. How much of the old wiring to replace is decided with you, once the walls are open and the wiring can be seen. With the walls open, it is the easiest time to replace wiring, since the runs are in plain view.
- Can we live in the house during a whole-house renovation?
- For a gut to the studs, plan to live elsewhere. That house cannot be lived in until the work is done and the inspector issues a certificate of compliance. If part of the house is ready and safe sooner, the inspector can issue a temporary certificate for that part. A smaller job can be staged around you, so the rooms you rely on stay usable.
- My house was built before 1978. What changes?
- Two things come in. Paid work that disturbs paint in a house built before 1978 falls under North Carolina's lead-safe renovation rules. Older houses can also hold asbestos in old flooring and its adhesive, joint compound or ceiling texture. On an older house, those materials are tested by an NC-accredited inspector before demolition.
- Is my old house exempt from the flood rule because it is historic?
- Age alone leaves a house under the rule. The exception covers a house the National Register or a certified local program lists as historic, when the work keeps that listing. Southport, Holden Beach, Oak Island and Burgaw also require a variance. In a local historic district, exterior work needs a certificate of appropriateness, and the layout inside is outside the commission's review.
- Can I add a bedroom in a whole-house renovation?
- Yes. A new bedroom needs a window or door big enough to escape through, plus its own smoke alarm. On a septic lot, the state sizes the system by its bedrooms, so an added bedroom goes to county environmental health first. A job that adds no bedroom can use the state's existing-system affidavit at the permit.
More renovation projects.
Regulatory figures on this page summarize the town and county codes each linked city page cites, and the public sources below. Ordinances change; the parcel and the current adopted code decide, and the site analysis confirms both for your lot.
- 2018 North Carolina Residential Code: Sections R102.7.1, R301.2.1.1, R310.1, R314, R315, R322, M1401.3, N1103.3 and N1109 (ICC Digital Codes)
- N.C. General Statutes § 160D-1110, building permits
- N.C. General Statutes § 160D-1116, certificates of compliance
- N.C. General Statutes § 160D-947, certificates of appropriateness
- FEMA P-758, Substantial Improvement/Substantial Damage Desk Reference
The whole house, planned at once.
Tell us where the house is, when it was built and what you want to change. We'll start with the flood rule and the permit path at that address.
Start Your Project