Whole-House Renovation

Whole-house renovation on the North Carolina coast

We open up older coastal houses and rebuild them inside. That can mean a new layout, new wiring and plumbing, new heating and cooling, and new walls and floors. In a flood zone, a job this big is counted against the town's flood line. So we check that line before design starts. We work in Brunswick, New Hanover and Pender Counties.

What you get with a whole-house plan.

We plan the work around you.

A house gutted to the studs can't be lived in during the work. A smaller job can be staged so the rooms you rely on stay usable.

We fix it while the walls are open.

Open walls make old wiring, pipes, ducts and air leaks easy to reach. What we touch meets today's code. Damage that only shows once the walls are open is carried as an allowance in the price.

One plan for the whole house.

The layout, the systems and the finish are drawn as one job. You keep the drawings. Each choice goes in your private online workspace with its reason.

We plan the whole house before a wall comes out.

A whole-house job can be new finishes throughout, new systems and finishes, or a gut to the studs with a new layout. Whatever its size, the plan starts with the house as it stands.

The assessment writes down the frame, the walls and roof, and the wiring, plumbing and heating and cooling. In a flood zone, it also notes your town's flood rule and how long it counts the work. We ask what was done to the house in that time, since that work can count too.

Send the address. We'll look up your town's flood line and how long it counts the work.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

The job, step by step

Assess the house

We write down the frame, the shell and the systems as they stand.

Check the flood rule

In a flood zone, we add up the whole scope and set it against your town's rule.

Draw and permit

The layout and the systems are drawn, priced and permitted.

Open to the studs

For a gut, the finishes come off down to the frame.

Frame and rough in

Walls, beams and bracing go in, then new wiring, pipes and ducts.

Insulate and close

Opened cavities in the shell are insulated before the drywall goes up.

Inspect and finish

The final inspection comes first, then the certificate of compliance. After a gut, that is when you move back in.

What the walls hide is an allowance.

Some damage only shows once the walls are open. That damage is carried as an allowance in the price.

The choices are yours.

Design is its own step, and you keep the drawings. Each decision goes into your private online workspace with the reason behind it. A tighter house needs fresh air brought in on purpose, and airtightness without stuffy interiors explains how.

Plan to move out for a gut.

A house gutted to the studs cannot be lived in during the work. You move back in once the final inspection passes and the inspector issues a certificate of compliance. If part of the house is ready and safe sooner, the inspector can issue a temporary certificate for that part.

A smaller job can be staged around you, with the rooms you rely on kept usable. Living through a renovation covers how that works.

The whole house, planned at once.

Tell us where the house is, when it was built and what you want to change. We'll start with the flood rule and the permit path at that address.

Start Your Project