910-946-5512Sign InStart Your Project
Bathroom Remodel

Bathroom remodeling on the North Carolina coast

We remodel bathrooms in Brunswick, New Hanover and Pender Counties, from one shower to the whole room. On this humid coast, damp air tests every bathroom. So we seal the shower behind the tile and send the fan's air outside. We also handle the permits most bathroom work needs.

What you get with a new bathroom.

Sealed behind the tile.

A waterproof layer goes behind the tile and under the shower floor. Before any tile goes on, the floor is filled with water and checked for leaks.

The damp goes outside.

The code marks our three counties warm and humid. Your fan is ducted to the outdoors, and a timer can keep it running after a shower.

We handle the permits.

Moving a drain, adding wiring or adding a fan each takes a permit, whatever the job costs. We take care of them, and your pipes are inspected before the walls close.

One bathroom is a whole job to us.

A bathroom is often a smaller job, and we take those on. One shower or one hall bath gets the permits its work needs, and the same waterproofing and written record as a larger remodel.

We start with an assessment, which writes down the house as it stands before anything is priced. Your private online workspace then holds each decision and the reason for it.

Send the address. We'll look up the permit path for a bathroom remodel there.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

Down to the studs

The old tile, tub and wallboard come out. We check the framing and subfloor behind them.

Repair the frame

Rotted wood is replaced. Backing for grab bars and a niche go in while the wall is open, if you want them.

Pipes and wires, inspected

The drain, vent, supply lines, valve, wiring and fan duct go in. The plumbing is tested and inspected before the walls close.

Waterproof and test

Backer board and the waterproof layer go on. A tiled shower floor is filled with water and checked.

Tile

Tile goes on over the waterproofing, on the floor and the walls.

Fixtures, glass and fan

Fixtures, glass, fan and lights are set, and the job gets its final inspection.

Rot behind the old shower is priced as an allowance.

Some damage only shows once the old shower is out, such as a soft subfloor or rotted framing. That damage is carried as an allowance in the price. If the rot runs into an outside wall, siding and envelope replacement covers the wall from the outside.

You make the choices.

  • A tub, a shower, or both
  • A tiled shower, or a prefab base or one-piece surround
  • A curb at the shower, or a curbless floor
  • The glass, the tile and the fixtures
  • The fan controls, such as a timer
  • Backing for grab bars, set while the walls are open

Grab bars and curbless showers are options.

Grab-bar backing and a curbless shower are options you can add. A curbless floor still has to slope to the drain, so it gets planned with the floor framing. Joists can only be notched so far, and reworked joists take a permit.

Moving the toilet, or adding a bathroom

A toilet or vanity can move, within limits. The drain needs its slope, and each fixture needs a vent. For a sink, tub or shower, that vent sits close to the trap. Joists limit how pipes cross them. An air admittance valve, a one-way vent valve, fitted to a fixture or branch drain can only serve fixtures on that floor. We work those limits out on paper first.

On a septic system, the state sizes the system by bedrooms. A new bathroom that comes with a new bedroom goes to Environmental Health first, as in Boiling Spring Lakes and Maple Hill. A bathroom alone leaves the bedroom count as it was.

If it's your only bathroom

We settle before work starts how long your bathroom will be out of use. Staging is planned for each house, around the scope and the house. Living through a renovation covers the rest.

Planning a kitchen too? Kitchen remodeling covers it. A bathroom can also be one room of a whole-house renovation.

References

Regulatory figures on this page summarize the town and county codes each linked city page cites, and the public sources below. Ordinances change; the parcel and the current adopted code decide, and the site analysis confirms both for your lot.

A bathroom that dries out between showers.

Tell us where the house is and which bathroom you want redone. We'll check its permit path before anything else.

Start Your Project
Wide Tropical Tides wordmark and architectural house illustration on a calm editorial background.