910-946-5512Sign InStart Your Project
Burgaw, Pender County, North Carolina

Custom home builder in Burgaw, North Carolina.

Burgaw is the Pender County seat, and it writes its own rules: a town zoning ordinance, a town flood chapter, and a town inspections department that issues its own permits. The town itself is a courthouse-square grid of narrow platted lots, ringed by larger parcels at the edge of town, well inland from the barrier islands the rest of Pender County is better known for. Building here means carrying the same performance standard the coast demands, worked out against a river town's flood geography, dimensional table and older housing stock. Tropical Tides is a custom home builder serving Burgaw from Southport, about 75 minutes away.

At a glance
County
Pender County, North Carolina; Burgaw is the county seat
Jurisdiction
Town of Burgaw: its own Unified Development Ordinance, governing town limits and a one-mile extraterritorial jurisdiction
Ultimate design wind speed
130 mph, the 'remainder of the county' zone of the 2018 NC Residential Code, Table R301.2(4), note j
Flood-map source
FEMA FIRM panels and the NC Flood Risk Information System, adopted through UDO Chapter 14, Flood Damage Prevention
Drive from Southport
About 55 miles, roughly 75 minutes via US 17, the I-140 bypass and I-40

Burgaw's courthouse-square grid still sets the size of a lot.

The town still reads as a county seat. A grid of platted streets fans out from the courthouse square, where the county government sits. On the western edge of downtown stands the depot the Wilmington and Weldon Railroad built around 1850, the oldest building in the historic district. Between the square and the depot, the Burgaw Historic District covers roughly fifty-seven acres of listed streetscape (houses running from the late nineteenth century to the middle of the twentieth, Gothic Revival and Queen Anne among them) on narrow lots.

That grid is the fact a design in Burgaw starts from. In-town lots inside the historic core run narrow and deep, platted before anyone was thinking about a two-car garage, and the buildable envelope on one of them is set less by the lot line than by what is already standing next door: a neighbor's porch, a mature oak, an old setback line. Move a few blocks out, past the last of the platted streets, and the lots open up: the edge of town carries larger parcels zoned for lower density, some of them still wooded, where the design questions start to look like the ones a wooded parcel in Rocky Point or an inland lot near Atkinson raises. Currie, southwest of town, and Castle Hayne, south along US 117 in New Hanover County, sit in the same rural-to-suburban range.

When Pender County split from New Hanover in 1875, the railroad offered land for a town if its Burgaw Depot stop became the county seat, which is how the depot and the courthouse ended up a few blocks apart. Burgaw sits in blueberry country, and the NC Blueberry Festival still brings the county in around the square each year.

Building ground in and around Burgaw comes in three broad kinds:

  • A narrow, deep in-town lot inside the original grid, where the buildable envelope is set as much by neighboring structures as by the zoning line
  • A larger RA parcel past the last platted street, often still wooded, where the acreage-scale yards apply instead of the in-town table
  • A lot inside the historic district, carrying both the town's dimensional standards and a National Register listing

Burgaw's rules reach a mile past the town line.

Burgaw is governed by its own Unified Development Ordinance, adopted separately from the Pender County UDO. Inside town limits, and inside the town's extraterritorial jurisdiction (the ring of land the town's own code extends its authority into), Burgaw's ordinance governs in place of the county's. Under Section 2-1 of the town's Code of Ordinances, that ETJ reaches one mile out from the town's boundary on every side, and it carries the town's zoning ordinance, subdivision regulations, the state building code and the town's inspection department into that ring along with it. A parcel just past what looks like the town line can still fall under Burgaw's review: the ETJ boundary mapped by the town clerk decides it.

Jurisdiction
Town of Burgaw: an incorporated municipality and the Pender County seat, governing town limits and a one-mile extraterritorial jurisdiction under Code of Ordinances Sec. 2-1
Adopted code
Town of Burgaw Unified Development Ordinance: zoning in Chapter 8, flood rules in UDO Chapter 14, Flood Damage Prevention
Permit authority
Town of Burgaw Planning Department and Building Inspections Department inside town limits and the ETJ; Pender County Inspections, Permitting & Planning for the unincorporated county beyond it
Flood-map source
FEMA FIRM panels and the NC Flood Risk Information System, on the basis UDO Chapter 14, Flood Damage Prevention, draws from the Pender County Flood Insurance Study (Sec. 14.4)
Flood protection elevation
Base Flood Elevation plus two feet of freeboard where a BFE is set; at least four feet above the highest adjacent grade in a mapped area with none (UDO Sec. 14.2)
Ultimate design wind speed
130 mph, the 'remainder of the county' zone of the 2018 NC Residential Code, Table R301.2(4), note j; Burgaw lies outside Topsail Township and well west of the Intracoastal Waterway

Inside that footprint, the zoning is organized around a handful of residential districts (RA, R-20, R-12 and R-7), each with its own table of minimum lot area, frontage and yard setbacks in the UDO's Section 8.13. The R-7 district, the tightest of the four and the one that covers much of the original in-town grid, sets a 7,000-square-foot minimum lot with 60 feet of frontage. R-12 steps up to 12,000 square feet and 75 feet of frontage; R-20 and the RA district move into acreage territory, RA sized to a full acre. Setbacks scale with the district too, tighter on an in-town R-7 lot and considerably deeper on an RA parcel at the edge of town, and corner lots, cul-de-sac lots and older lots of record follow their own rules inside the same section, which the site analysis reads before a design assumes an envelope.

R-7 district (in-town)
7,000 sq ft minimum lot, 60 ft frontage, 25 ft front / 12 ft side / 10 ft rear yards, with 5 ft added to the side yard for each story above two (Burgaw UDO Sec. 8.13)
R-12 district
12,000 sq ft minimum lot, 75 ft frontage, 25 ft front / 15 ft side / 20 ft rear yards (Burgaw UDO Sec. 8.13)
R-20 and RA districts
20,000 sq ft minimum (RA: one acre), 100 ft frontage, 50 ft front / 20 ft side / 40 ft rear yards (Burgaw UDO Sec. 8.13)
Height limit
35 ft maximum in the RA, R-20, R-12 and R-7 districts (Burgaw UDO Sec. 8.13); the PUD district allows 45 ft or three stories and the two industrial districts 55 ft

That same section caps building height at 35 feet across the RA, R-20, R-12 and R-7 districts, which is most of the housing stock in and around town. Other districts carry their own figures, and chimneys, flagpoles, ventilators and antennae sit outside the height table altogether. A detached garage or accessory building of 500 square feet or less gets a lighter rule than the principal structure, able to stand as close as five feet to a side or rear line, with a deeper setback on the street side of a corner lot; anything larger meets the district setbacks a house would. Fences take their own line in the same section: six feet in a side or rear yard, four feet in a residential front yard, the finished side facing out, and along a street right-of-way a short list of permitted materials: wood, stone, brick, decorative concrete block, wrought iron, or a product made to resemble one of them.

Burgaw runs its own permitting. The town's Planning Department administers the UDO, and the town's own Building Inspections Department, at 103 North Walker Street downtown (910-259-9934), issues permits and performs inspections across town limits and the ETJ; inspections on a Burgaw project are requested through that same office. Pender County's Inspections, Permitting and Planning division, which also works out of Burgaw, covers the unincorporated county outside that boundary.

A special use permit, which an accessory apartment on an R-7 or R-12 lot needs, goes to a quasi-judicial public hearing: the Board of Adjustment decides minor special use permits and hears appeals, and the Board of Commissioners decides major ones. Larger applications, a subdivision among them, first pass a Technical Review Committee chaired by the Town Planner.

Two smaller provisions in Section 8.13 show how Burgaw enforces its table. Any structure over 500 square feet built closer than twice its required setback owes the Town Planner a foundation survey, prepared by a professional land surveyor and delivered within 21 days of the foundation being completed. And where a good-faith error has already put a wall out of position, the Town Planner can grant an administrative deviation of up to 10 percent of the required setback or 24 inches, whichever is smaller.

Burgaw's flood map follows the Northeast Cape Fear.

The Northeast Cape Fear River runs east of town. UDO Chapter 14, Flood Damage Prevention, sets the town's Special Flood Hazard Areas from the Flood Insurance Study for Pender County dated February 16, 2007, produced under the state's mapping partnership with FEMA and adopted by reference along with the digital data that came out of it; any later revision to that mapping has to be picked up by the town within three months of being issued. That basis follows the ground itself: land annexed into Burgaw, or drawn into its extraterritorial jurisdiction after the fact, inherits the same flood-map basis the rest of town already carries, regardless of when the corporate limit moved.

Inside town, the Osgood Canal runs through the middle of Burgaw, and the town has built a 2.6-mile greenway loop along it. On an in-town lot, how close that channel runs and which direction the ground actually slopes toward it are drainage questions the site analysis answers first.

Where a lot falls decides what the flood ordinance asks of it, and that is a parcel-level question. On a mapped lot where FEMA has set a Base Flood Elevation, Section 14.17 holds the reference level of new construction, or of a substantial improvement, to the regulatory flood protection elevation, and Section 14.2 defines that elevation: the Base Flood Elevation plus two feet of freeboard. In a mapped area with no Base Flood Elevation, the same definition puts it at least four feet above the highest adjacent grade. A Zone AO area of shallow flooding works from the FIRM instead, and Section 14.22 sets the reference level at the depth number shown there plus the same two feet, measured above the highest adjacent grade. Which of the three a given lot answers to is printed on the FIRM panel for that parcel, and the town's floodplain administrator confirms it before a floodplain development permit issues.

On the approximate Zone A stretches of the river and its tributaries, where FEMA never established a Base Flood Elevation at all, Section 14.19 draws a hard line: no fill, no new construction, no substantial improvement and no new development within 20 feet of either side of the top of the bank, or within five times the width of the stream, whichever reaches further, unless a registered professional engineer certifies, with technical data behind it, that the encroachment will not raise flood levels during the base flood discharge. The ordinance then works down a stated priority order of data sources to arrive at a base flood elevation anyway.

Burgaw's river actually floods. In September 2018, during Hurricane Florence, the gauge on the Northeast Cape Fear at Burgaw crested at 25.58 feet, more than three feet above the crest Hurricane Floyd had set in 1999.

Wind changes between Burgaw and the coast by a specific rule. Note j to Table R301.2(4) of the 2018 NC Residential Code splits Pender County three ways: 150 mph east of the Intracoastal Waterway, 140 mph in Topsail Township west of it, and 130 mph in the remainder of the county, which is where Burgaw sits. And 130 mph is exactly the speed at which Section R301.2.1.1 requires construction to follow a recognized wind standard (the Wood Frame Construction Manual, ICC 600, ASCE 7 or the International Building Code) in place of the code's general provisions. Pender is among the twenty North Carolina counties subject to the Coastal Area Management Act, and a CAMA permit applies only inside an Area of Environmental Concern, which this far up the Northeast Cape Fear means a narrow shoreline band along the river; an in-town lot away from the water sits outside it. Pender has no local permit officer on the state's list, so where an AEC does reach a lot, the Division of Coastal Management's Wilmington office settles it and issues the permit.

On an inland, river-adjacent site, moisture planning gets treated as seriously as it would on the coast: drying potential on a river lot lays out why drainage and drying matter as much as flood elevation once construction is underway.

A narrow Burgaw lot gets solved inside the envelope it already has.

On a Burgaw lot, a written site analysis delivered before design covers flood zone classification, wind exposure, sun path, view corridors and whatever regulatory constraints attach to that specific parcel. A courthouse-grid lot starts the design from its own envelope, its oaks and its drainage, the same principle behind new construction that starts from the lot.

On a platted grid lot, the first task is establishing the real dimensional envelope: which district the parcel sits in, which row of the Section 8.13 table governs it, whether it is a corner lot or a prior lot of record with its own rules, and how much of the buildable area a mature canopy (oaks older than the house beside them) leaves available once the trees are treated as worth keeping. A narrow in-town lot rarely has room to solve a design problem by moving the footprint. It gets solved inside the envelope that is already there.

Drainage is the second task, and on a canal-adjacent or low-lying in-town lot it carries real weight. Which direction the ground actually slopes, whether the Osgood Canal or a connected ditch is the natural outlet, and what happens to that water during a slow-moving storm are questions the site analysis answers before a floor elevation gets drawn.

Utility connection is the third, and it is a genuinely local question. Burgaw operates its own water and sewer utility inside town limits, separate from Pender County Utilities and drawing its drinking water from deep wells in the Black Creek Aquifer, and where that service reaches a lot, well-and-septic sizing drops out of the design constraints entirely, a real difference from a rural Pender parcel, where the drainfield has to be sized to the soil before the floor plan is settled. Toward the outer edge of the extraterritorial jurisdiction we confirm service with the town for the specific parcel.

Sun path and shade work differently here too. A mature canopy on a historic-district lot is worth designing around: for daylighting, for cooling load, for how a porch actually gets used through a Carolina summer. The analysis reads the canopy the way it reads the flood map: as a fixed condition the design responds to, documented before the first line gets drawn and kept in the private workspace each client holds.

Inland at 130 mph, a Burgaw roof still gets FORTIFIED Gold.

Past the last platted street, Burgaw gives way to a mix of woodland and open farm fields, and that open ground is what a wind engineer reads first here. The mapped speed is 130 mph, the lowest of Pender County's three zones, but a mapped speed belongs to the zone. The lot-level variable is exposure. A house on the in-town grid, screened by neighbors and old oaks on every side, and a house on an RA parcel with open field running to windward can sit in different exposure categories, and the engineer designs them to different pressures. An exposed inland roof has weak points that a 130 mph wind finds too, and wind-driven rain reaches it in the same storm that crossed the beach first; in 2018 the storm that flooded Burgaw from the river had come ashore near Wrightsville Beach.

The code eases off here in one specific way. Section R4601.1 of the NC Residential Code applies Chapter 46, the state's coastal and floodplain construction chapter, in coastal high hazard areas, ocean hazard areas, regulatory floodplain areas and the 150 mph wind zone. At 130 mph, Burgaw reaches Chapter 46 only through the flood map: a lot inside the mapped floodplain along the river or the canal takes it on, and a lot on higher ground a few streets back does not. The high-wind design R301.2.1.1 requires applies either way. What drops away on an unmapped lot is the coastal chapter layered on top of it, and the FORTIFIED Gold roof and load path is how comparable detailing comes back in: a sealed roof deck, protected openings and a continuous load path from roof to foundation, pursued on every Tropical Tides project and third-party verified for IBHS certification. In Burgaw, that detailing is the part of the coastal standard the code stops asking for at this distance, kept on purpose.

Airtightness is the second half of the standard. Burgaw gets less of the sea breeze that moves air through a house on the islands. The code's energy chapter puts Pender County in Climate Zone 3A and marks it warm-humid in Table N1101.7; in town that reads as a long, hot, humid season and still air. Every Tropical Tides project carries a sub-1.0 ACH50 airtightness target, well below what the energy code asks for, as a design target carried into construction; it stays a design target until the blower door on that house reports the number.

That target does real work in a climate like this one. A tight, continuous air barrier keeps humid outdoor air from finding its way into wall cavities and condensing where no one can see it happen, which is behind many of the moisture problems a decades-old house in this climate develops. It also lets the mechanical system do less work chasing infiltration, which is what lets it be sized to the load that is actually there, the logic behind heating and cooling sized to the load, and the reasoning behind why a tight house still feels open.

At 130 mph, a Burgaw lot meets the code's coastal chapter only where the flood map puts it.

A 1920s bungalow or a 1960s brick ranch is worth renovating first.

Much of Burgaw's older housing stock makes renovation the first question worth asking. The listed district alone spans the late nineteenth century to the middle of the twentieth, and the blocks beyond it fill in with the plainer stock that came after: real houses, built to the standard of their decade, many of them due for an envelope and a mechanical system the decade never gave them. At that age, renovating a house on the grid is usually performance work: the envelope, the air sealing and the mechanical system.

A house inside the historic district raises its own questions before the first wall gets opened. Its National Register listing is federal recognition of the district, and the town reviews a house there against the same zoning table as its neighbors: Burgaw's UDO gives the Board of Commissioners power to adopt design guidelines for a Historic Preservation Overlay District, but none of the overlay districts in its zoning chapter (Section 8.6) is a historic one. The street face, the porch and the proportions that make the house legible as part of that district are still worth protecting through the renovation.

The performance work usually happens out of sight: air sealing at the sill, the attic plane and every penetration; insulation upgraded to a level the original framing was never built to carry; mechanical equipment resized to the tighter envelope that results. Getting the drying path through an old wall right (what layer dries which direction, and what a new interior finish does to that path) decides whether the wall dries or hides a problem behind a fresh coat of paint.

Where a lot sits inside a mapped flood zone, a renovation crosses into a different regulatory category once its cost reaches the substantial-improvement line in Section 14.2: 50 percent of the building's market value, land excluded, counted across any five-year period. Cross it, and the existing house is held to the same elevation standard as new construction. The same definition carries an exception that matters on the grid in particular. An alteration to a historic structure, a term that includes a house certified as contributing to a National Register district, can fall outside it, provided the work keeps the structure's historic designation and is approved by variance under Section 14.15. Whether a given house qualifies, and whether a given scope trips the threshold, is the floodplain administrator's call, made before a permit is issued.

New construction in Burgaw fills in the grid one infill lot at a time.

Burgaw still has room for new homes, on two kinds of ground: new construction inside its own boundary on an infill lot inside the R-7 or R-12 grid where an older structure has come down, and on an edge parcel in the RA district where the town's acreage-scale setbacks apply instead of the tighter in-town table. An infill lot is worked inside an envelope the neighbors on both sides already set; an edge parcel has more room to move but a fifty-foot front yard to give back and, often, no tap at the road.

An infill lot inherits the character of the grid around it whether a design leans into that or argues with it. The district table sets the floor (minimum lot area, frontage, the yard setbacks) and the 35-foot cap sets the top. Between the two, the practical work is fitting a house that reads as part of the street, on ground platted for a smaller house than many households now want. The work is mostly proportion, and it is usually solved in the roof.

An edge parcel carries a different list from an infill lot, and most of it is invisible from the road. Longer utility runs. A driveway that has to be engineered. Stormwater that has nowhere to go but the ground it fell on. And, where the town's taps have not reached, a drainfield sized to the soil before the floor plan is settled. The pre-design site analysis prices it while the parcel is still a decision.

An accessory dwelling is a real path in parts of Burgaw, and the UDO is specific about which parts. Section 8.15 names the 'Accessory Apartment' as a use of its own: a complete, independent unit with a kitchen, sanitation and sleeping space, whether it sits inside the house, is added onto it or stands detached on the same lot, with guest houses and mother-in-law suites counted in. The section lists three districts where that use is allowed by right, subject to its standards: RA, R-20 and B-1, the Central Business District at the center of town. In B-1 the unit can also sit on an upper floor of, or behind, a commercial building, and Section 8.5 describes that district as taking in some of the residential lots inside the National Register district too. The Section 8.15 standards that come with it:

  • Size: no more than 50 percent of the principal structure or 800 square feet, whichever is less
  • Setback: at least ten feet from the side and rear lot lines for a detached unit
  • Utilities: adequate water and sewer, or an approved septic system
  • Entrance: on the side or rear of the house, for an attached unit
  • Form: subordinate to the house and, if detached, architecturally compatible with it in roof pitch, wall and trim material, style and window details; a manufactured home does not qualify
  • Parking: off-street, for any vehicles the occupants own

That list leaves out much of the in-town grid, where R-7 and R-12 zoning is common and neither district is one of the three. Section 8.16 covers those two districts, along with PUD and O&I, and the Section 8.14 use table agrees: there an accessory apartment needs a minor special use permit, heard by the Board of Adjustment in the same quasi-judicial process the town uses for any special use, with its four findings of fact, its evidentiary record and the board's power to attach conditions stricter than the written standard. The 50-percent-or-800-square-foot cap applies there as well. The owner of a typical R-7 or R-12 grid lot applies for an accessory apartment and makes the case for it. On an RA or R-20 parcel (the lower-density districts where many of the larger lots toward the edge of town sit), the code allows one by right under the Section 8.15 standards alone, and the same holds in B-1.

On an RA parcel, the utilities item in that list is the one to watch. Section 8.5 describes the district as not typically served by public water and sewer, so the drainfield question an edge parcel already raises comes back with a second unit attached: an approved septic system is typically what an accessory apartment there depends on. Wherever the lot sits, the zoning district comes first. Which of the two tracks a parcel is on comes off the town's zoning map, and we read it before a design for an accessory apartment gets past a sketch. After that, an accessory apartment runs the same review any other structure does: the same table, the same inspections, the same flood chapter if the lot is mapped.

A detached garage, workshop or studio that no one sleeps in is a different use, and the UDO allows it in every residential district, R-7 and R-12 included. Section 8.15 bars residential occupancy in it, caps it at half the gross floor area of the house unless the Board of Commissioners grants a major special use permit, and allows no more than two on a residential lot; inside the Central Fire District downtown, the fire marshal approves the plans before a zoning permit issues. Section 8.13 then gives the smaller ones the friendlier line: at 500 square feet or less, one can stand within five feet of a side or rear line, and only above that size does it owe the district setback in full. That gap is wide enough to matter on a narrow in-town lot.

In Burgaw we build with the trade partners Tropical Tides directs, under North Carolina Residential Contractor License #109520. We're Brunswick County Home Builders Association members, and 910-946-5512 reaches the office.

Common questions

Before you buy or build in Burgaw.

My lot is outside the Burgaw town limits. Does the town or the county review it?
Often the town. Section 2-1 of the Burgaw Code of Ordinances carries the town's zoning, subdivision regulations, building-code enforcement and inspection department one mile past the corporate limits on every side, so a parcel that looks rural can still be permitted at the town's counter on North Walker Street. The boundary is drawn on an official map kept by the town clerk, and that map decides which office takes the application. Pender County's own division reviews what lies beyond it.
What zoning districts apply to a lot inside Burgaw's grid?
Most in-town residential lots fall into R-7, R-12 or R-20, with RA covering larger parcels toward the edge of town, each carrying its own minimum lot size, frontage and yard setbacks under the UDO's Section 8.13 dimensional table, and a shared 35-foot height limit across those districts. Corner lots, cul-de-sac lots and older lots of record follow separate rules inside the same section, which is why confirming the exact district and row that applies to a specific parcel comes before any design work starts.
Is Burgaw's historic district a protected zoning overlay, or just a National Register listing?
A National Register listing. The listing is a matter of public record, and Burgaw's UDO gives the Board of Commissioners power to adopt design guidelines for a Historic Preservation Overlay District, but none of the overlay districts in its zoning chapter is a historic one, so a house in the district answers to the same zoning table as its neighbors. In a mapped flood area the listing can matter a second way: UDO Chapter 14, Flood Damage Prevention, can exempt an alteration to a house certified as contributing to the district from its substantial-improvement rule, by variance.
How do I know if my lot in Burgaw, NC sits in a flood zone?
That depends entirely on the parcel. UDO Chapter 14, Flood Damage Prevention, sets the town's flood hazard areas from FEMA mapping tied to the Pender County Flood Insurance Study, and blocks in town carry different designations depending on how they sit relative to the Northeast Cape Fear River and the Osgood Canal. Where a lot is mapped with a Base Flood Elevation, Section 14.2 puts the regulatory flood protection elevation two feet above it. The current FIRM panel or the NC Flood Risk Information System answers the question for a specific address, and the town's floodplain administrator confirms it.
Will a lot in Burgaw have town water and sewer, or should I plan on a well and septic?
Inside town limits, usually the former: Burgaw is its own utility rather than a Pender County Utilities customer, and it draws drinking water from deep wells into the Black Creek Aquifer. Where a lot has a tap at the street, drainfield sizing drops out of the design. Past the corporate limits, out toward the edge of the extraterritorial jurisdiction, the answer turns parcel by parcel, and we settle it with the town before a lot is under contract.
Can I build an ADU in Burgaw, NC?
It turns on the zoning district, and the UDO names the districts. Section 8.15 allows an Accessory Apartment by right in RA, R-20 and B-1, capped at 50 percent of the principal structure or 800 square feet, whichever is less, with adequate water and sewer or an approved septic system, and at least ten feet of side and rear setback for a detached unit. Much of the in-town grid is zoned R-7 or R-12, where Section 8.16 requires a minor special use permit from the Board of Adjustment instead, under the same size cap. A garage apartment with its own kitchen counts as an accessory apartment; a garage no one lives in is a separate accessory-structure use.
Why would Burgaw ask for a land survey once the foundation is in?
Section 8.13 of the UDO requires a foundation survey, prepared by a professional land surveyor and delivered to the Town Planner within 21 days of the foundation being completed, for any structure over 500 square feet whose setback is less than twice the required distance. On a narrow in-town lot that can describe many new houses and additions, so we plan for the survey from the start.
Should I renovate or start over on an older house in Burgaw, NC?
For an older house in or near the historic district, renovation is the question to settle first, before anyone prices starting over. A 1920s bungalow or a mid-century brick ranch often has a street presence worth keeping; what it usually lacks is a modern envelope and right-sized mechanical equipment, which an airtightness- and moisture-focused renovation adds while keeping the porch and the roofline. The site analysis and a look inside the walls decide it, house by house.

Tell us about your Burgaw site.

Every project begins with a formal site analysis of your specific parcel: flood zone, wind exposure, sun path, drainage, and the constraints that come with it. That document is yours, and it comes before any design decision.

Start Your Project
Explore further