Custom home builder in Leland, North Carolina, across the river from Wilmington.

Send the address. We'll tell you how much house your zoning allows, plus your wind speed and flood zone.
A forty-minute drive from Southport.
Southport, our home base, is about 27 miles away on NC 87. We design and direct every project from there.
We read your graded lot.
The grading plan was drawn for the whole subdivision. Before any floor plan, our written site analysis reads how water moves across your lot.
Built for wind and wet ground.
Every home we design pursues FORTIFIED Gold. Our air-leak target, under 1.0 ACH50, controls where humid air moves. It is tested before handover.
Here's what Leland decides for your lot.
We build new homes and remodel existing ones in Leland, from our home base in Southport.
- Where the map sets a flood height, the house must sit two feet above it.
- On a rural lot with a well and septic, the septic can move where the house goes.
- An attached apartment can be up to 800 square feet, and no more than 35 percent of the house's floor area.
- At a glance
- County
- Brunswick County
- Jurisdiction
- Town of Leland. The town runs zoning, building permits, inspections and floodplain review.
- Ultimate design wind speed
- 140 mph west of US 17, 150 mph east (2018 NC Residential Code).
- Flood mapping
- Checked lot by lot on the state's flood map system. The town uses the county's 2019 flood study.
- Drive from Southport
- About 27 miles, roughly 40 minutes, most directly via NC 87
Residential Contractor License #109520 · Member, Brunswick County Home Builders Association
Leland's zoning decides how much house fits on your lot.
- Jurisdiction
- Town of Leland, Brunswick County: zoning, building permits, inspections and floodplain administration all stay with the town
- Adopted code
- Town of Leland Code of Ordinances: Chapter 66 (Zoning), Chapter 26 (Environment, Floods and Stormwater) and, on rezoned parcels only, Chapter 30 (the FlexCode); Article II of Chapter 26 is the Flood Damage Prevention ordinance
- Permit authority
- Town of Leland Planning & Inspections Department, 102 Town Hall Drive; a zoning-compliance certificate (Sec. 66-30) comes before the building permit
- Ultimate design wind speed
- 140 mph west of US 17 and 150 mph east of it, with both zones inside Leland (2018 NC Residential Code, Table R301.2(4))
- Single-family districts
- R-20 (20,000 sq ft minimum lot), R-15 (15,000 sq ft) and R-6 (6,000 sq ft where public water and sewer serve the lot, 15,000 sq ft where they do not) under Sec. 66-163
- Private review on top
- Brunswick Forest, Magnolia Greens, Waterford of the Carolinas and Compass Pointe each run their own architectural review on top of the town permit
Which of Leland's rules reach your lot depends on where it sits. Its zoning district sets the minimum lot size, the setbacks and the height limit, and a community board may add its own review.
Leland is incorporated, so the town's own code governs every lot inside its limits. The town's Planning & Inspections Department handles zoning review, building permits, inspections and floodplain administration. Brunswick County isn't a step in that process for a Leland address. Under Sec. 66-30 of the town's zoning ordinance, a building permit can't be approved until the building inspector holds a signed zoning-compliance certificate. The code-enforcement officer signs it. Because Brunswick County is a coastal county, the certificate application also has to show the location of any applicable Area of Environmental Concern. Leland's building inspector serves as the local CAMA permit officer under the county's implementation plan. CAMA is North Carolina's Coastal Area Management Act.
Most of the town's conventional single-family ground sits in one of three districts. R-20 sets a 20,000-square-foot minimum lot. R-15 sets 15,000 square feet, or more where the county sanitarian needs room for an approved septic system. In both, the same table sets a 30-foot front setback, a 7.5-foot side yard and a 15-foot rear yard. The height limit is 40 feet. Minimum lot width at the setback line is 100 feet in R-20 and 70 feet in R-15. On a cul-de-sac, those drop to 66 and 46 feet. A corner lot needs a deeper side yard along the side street: 20 feet in R-20 and R-15, 12 feet in R-6. A lot recorded before the zoning ordinance was adopted can use the table's grandfather note instead. That note sets a 15-foot side yard and 30-foot front and rear yards. It's worth checking on an older Village Road parcel. The third district, R-6, sets a 6,000-square-foot minimum where public water and sewer both serve the lot. That minimum rises to 15,000 square feet where they don't. A duplex or triplex is permitted there only where both utilities serve the lot.
Some Leland lots sit outside those three districts. Where a master-planned community was approved as a planned unit development (PUD), Sec. 66-163 gives its lots a separate column in the same table. That column sets no fixed minimum lot size or width. It sets a five-foot side yard and a seven-and-a-half-foot rear yard. The front setback is 25 feet, or 15 feet for a single-family dwelling, duplex, triplex or townhouse. That is a much tighter envelope than R-20's. So the lot's zoning district, confirmed on the town's zoning map, decides what it can hold.
Leland's code also carries a form-based chapter, Chapter 30 (the FlexCode), with its own lot and building rules. It reaches only the parcels the town council has rezoned into a FlexCode Zone, each one marked on the town's official zoning map. Inside that zone, the FlexCode replaces the conventional districts as the lot's zoning. Planning & Inspections confirms whether a specific parcel has been rezoned into it.
Inside a gated or master-planned community, a second review sits on top of the town's. It comes from the community's architectural board, which has its own guidelines, submittal process and timeline. A project there needs both approvals, and the two run on separate schedules.
A new home in Leland goes into a subdivision or onto open ground.
Two kinds of new construction in Leland
New construction in Leland happens in one of two settings. Inside a master-planned community, a custom home goes on one of the remaining lots in a phase, already graded and platted. There, the community's architectural board shapes the design along with the town's zoning table. Outside the communities, the ground is closer to a blank site. That covers Village Road, an infill parcel elsewhere in town, or acreage toward the edge of town. No ARC covenant (a community's architectural review rules) sets design limits in advance. Often there's no pre-graded pad or stormwater pond either. Both start from the same site analysis. What changes is whether the town code, a private board or the raw lot does the most work on the design.
Renovating what Leland's growth years built
Most of Leland's housing went up during the growth years of the past two decades or so. It was built to a production specification that met the code of its time. It rarely carried a performance target or a documented airtightness figure. A Leland renovation is usually a judgment about how much of a sound, well-sited house to carry forward. It's also about how much to bring to a current standard: mechanical equipment right-sized to the house, and the roof and openings brought current. Where the flood ordinance reaches the property, the improvement gets tested against it while the scope is still open.
An accessory dwelling unit on a Leland lot
Leland's zoning code permits an accessory apartment in the R-20, R-15, R-6 and PUD districts, both attached and detached. A detached unit is also allowed in the RMH and multi-family districts (Sec. 66-162). An attached apartment is capped at 35 percent of the principal house's floor area, or 800 square feet, whichever is less. It also needs one added off-street parking space (Note 28 to Sec. 66-162). A detached apartment answers to its own standard. The lot's principal structure has to be single-family. The unit is capped at 35 percent of the house's lot coverage, or 1,200 square feet, whichever is less. It has to sit entirely behind the principal structure. Its side and rear setback is 15 feet, or the district's own minimum for a house, whichever is less, and never under five feet. Its height cannot exceed the main house, or 35 feet, whichever is less (Sec. 66-229(b)(3)). Either way, only one accessory apartment is allowed per lot. Inside a covenant-governed community, there's a second question the zoning table doesn't answer. It is whether the covenants allow a second structure or a second living unit at all. That can be the stricter test. What makes an accessory dwelling feasible on a particular lot works through both sides of it.
Leland grew from a crossroads into a commuter town.
Most of the town went up quickly, in production subdivisions laid across flat, poorly drained flatwoods. The typical house here was drawn to a specification before anyone stood on its lot.
Leland occupies the northeastern corner of Brunswick County, spanning both Northwest and Town Creek townships, with an irregular outline on the map. Navassa borders it to the north. Belville, separately incorporated with its own government and its own code, sits wrapped on three sides by Leland. The Brunswick River runs along the eastern edge. Sturgeon Creek, Alligator Creek, Mallory Creek, Jackeys Creek and a handful of smaller branches drain the flat ground behind it. US 17, 74 and 76 run together through town toward the river crossings into Wilmington. NC 87 and NC 133 come up from the south.
Village Road is the older thread through all of it, a low grid of houses and small commercial buildings. It predates the subdivisions now built out along and beyond it. Around that crossroads, over the past two decades, came a chain of master-planned communities. Among them are Brunswick Forest, Magnolia Greens, Waterford of the Carolinas and Compass Pointe, laid across land that was largely timber and farmland. The growth came the same way throughout: subdivisions built out phase by phase, with new homes largely built to a production specification.
Two things tie Leland to Wilmington across the water. One is the set of highway crossings that have carried US 17, 74 and 76 traffic for decades. The other is I-140, the Wilmington Bypass, completed in stages through the 2010s and meeting US 74/76 at an interchange in town. Together they make Leland a commuter town, and much of the growth here has been year-round homes. The building problem changes with the ground. When building in Southport and on the islands below it, the first threats are salt and surge. In Leland the threat is water that sits in the ground and is slow to leave.
That growth left three kinds of buildable ground, and a custom project starts by knowing which one it's on.
- A remaining lot inside one of the master-planned communities: graded, platted, and in some of them open only to builders the community has approved.
- An infill parcel along Village Road or another older road nearby. It often has an existing structure, an irregular lot shape and no subdivision covenant review.
- Outlying acreage toward the edges of town, where the ground is still timber and farmland and the questions are drainage, access and utility service.
Both the flood map and the wind map split Leland.
- Regulatory flood protection elevation
- Base flood elevation plus 2 ft of freeboard where a BFE is set; at least 2 ft above the highest adjacent grade where it is not (Sec. 26-30)
- Pre/post-FIRM date
- October 19, 1992: construction begun before that date is pre-FIRM under the town's flood ordinance (Sec. 26-30)
- Flood-resistant materials
- Must meet FEMA Technical Bulletin 2 (Class 4/5), able to withstand 72 hours of direct floodwater contact without more than low-cost cosmetic repair
- Flood study basis
- FEMA Flood Insurance Study for Brunswick County, dated December 6, 2019, and its DFIRM panels, adopted by reference (Sec. 26-32)
The ground under most of Leland is flat pine flatwoods, and flat ground sheds water slowly. Subdivisions built here in the past two decades typically answer that with a stormwater pond, or a chain of them. Each pond is engineered under the subdivision's permit to hold runoff and release it at a controlled rate. That infrastructure is sized for the whole subdivision at once. The town's stormwater ordinance is written to match. It reaches new subdivisions and larger land-disturbing projects as a matter of course. For a single lot inside an already-permitted subdivision, it touches only the edges. That might mean grading close to a pond, or enough new impervious surface to trip a narrower threshold. Engineering review applies that threshold case by case. For one house that is rarely a serious obstacle. But the pond, its easement and the subdivision's grading plan are still facts on the ground the design has to work with.
Flood mapping follows the Brunswick River and Sturgeon Creek. The town's flood damage prevention article, enacted in 2018 and amended as recently as 2023, sets out how it works. The special flood hazard areas it regulates are the ones in the Flood Insurance Study for Brunswick County. Leland's ordinance adopts that study by reference, along with its digital flood insurance rate map panels. The study's current revision is dated December 6, 2019. The base flood elevation is the flood height the map sets, and freeboard is the extra height the town adds above it. Where a base flood elevation has been set for a lot, the regulatory flood protection elevation sits two feet above it. Where none has been set, it sits at least two feet above the highest adjacent grade instead. Construction begun before October 19, 1992 counts as pre-FIRM under the town's definitions. Anything built on or after that date is post-FIRM, a distinction that matters most to a renovation. Any material used below the regulatory elevation also has to meet a flood-resistance standard. It has to withstand at least 72 hours of direct contact with floodwater, without more than minor, low-cost repair.
Inside a mapped special flood hazard area, the flood article sets general standards for a structure. It has to be anchored against flotation and lateral movement, and built with the flood-resistant materials the ordinance defines. Electrical, mechanical and plumbing equipment has to sit above the regulatory flood protection elevation, or otherwise be protected from flood entry. A floodplain development permit tracks that through construction. It starts with a plot plan showing the mapped boundary and the base flood elevation. Then comes a series of elevation certificates, from a pre-construction reading to a final as-built survey, before an occupancy certificate is issued. The answer differs lot by lot. Which FEMA panel covers a specific lot, and its effective date, are parcel-level facts. So is whether that lot carries a base flood elevation at all. All three are read off the map for that parcel, through the NC Flood Risk Information System or with the town's floodplain administrator.
Wind design splits the town the same way, along a line anyone can see. Table R301.2(4) of the 2018 North Carolina Residential Code sets Brunswick County's ultimate design wind speed. It is 140 mph west of US 17, and 150 mph east of it. US 17 runs straight through Leland, so both zones exist inside one town, sometimes a few minutes' drive apart. The design professional settles which one governs a given house at that address. Either side of the highway shares the same climate: hot, humid summers. There's less of the airborne salt that drives fastener and connector choices at the beach. Moisture is the persistent threat here. A slab or a crawlspace on ground that holds water longer than sand does has to be designed for it. Planning for moisture before it appears works through exactly that kind of ground.
The subdivision graded your lot. We still read it.
Most Leland building lots arrive graded, platted and given a pad elevation by the subdivision engineer. That grading plan was drawn for the whole subdivision. How water moves across one lot inside it is a separate question. A few inches of finished-floor elevation can decide whether a heavy rain passes unnoticed or leaves a wet crawlspace. So can the direction a house turns relative to the swale beside it, and how close the footprint sits to a pond's maintenance easement.
On ground this flat, the distance between a dry foundation and a standing-water problem is a matter of inches in finished-floor elevation.
The water table sits high across much of this ground. That shapes the foundation before anyone has a preference about it. Whether a crawlspace is vented or conditioned, and how a slab is prepared, both answer to the water table. What it does on that pad through a wet season decides the approach. A lot backing onto a stormwater pond usually carries a maintenance easement and a setback from the water's edge. Both lines come from the recorded plat, and they shape the buildable footprint before the design starts. Tree retention is a narrow question here. The town's zoning code sets a tree-survey standard only for larger multi-family development. Planning & Inspections confirms it for a specific lot, and a covenant-governed community may add a tree rule of its own.
Orientation is a more open question on a cleared subdivision lot than on a wooded one. There is rarely a mature canopy already deciding where the shade falls, so reading sun path and prevailing wind is real work here. Inside Brunswick Forest, Magnolia Greens, Waterford or Compass Pointe, the analysis also accounts for the community's architectural board. That board has its own submittal formats, review windows and design constraints to meet before it approves anything. The formal site analysis covers the flood zone, the wind exposure, and drainage relative to the graded pad and any adjacent pond. It covers sun and orientation, too, and whichever rules attach to the parcel, whether that's the town code, a community board, or both. The document goes into the client's project workspace before a floor plan exists.
We build for the humidity as much as the wind.
Most of what has gone up in Leland over the past two decades was built to a production specification. That means a set of plans repeated across a subdivision, framed and finished to a schedule that works at volume. Each set is drawn to the code minimum for whichever ultimate design wind speed Table R301.2(4) assigns the parcel. Every home we design pursues FORTIFIED Gold, the highest tier from the Insurance Institute for Business & Home Safety. It reaches the roof deck, the wall assembly, every opening and the continuous load path connecting them. It's a documented, inspected standard above the code minimum. An independent evaluator checks the work, and IBHS issues the designation.
Airtightness is the other half of the standard, and on this ground it is a moisture question before it is an energy one. The sub-1.0 ACH50 target is a design figure, written into the drawings and carried into construction, confirmed by a blower-door test before handover. What it controls is where humid air can move through the wall and roof assembly. On flat, poorly drained ground inland, that control matters. A continuous air barrier, tracked across every junction, penetration and transition on the drawings, is how that path gets closed. It has to be closed before the wall is closed up around it. What the airtightness target actually controls goes into the assembly detail. Why a tight house does not have to feel stuffy covers the ventilation that has to travel with it.
Mechanical sizing follows the same logic. A production house is often equipped by a rule of thumb tied to square footage. That oversizes the system for the tighter, better-insulated envelope a custom design creates. In a hot, humid climate an oversized system satisfies the thermostat quickly. It shuts off before it has run long enough to pull water out of the air. The result is short bursts that cool the air without drying it. Over a slab on flatwoods ground with the water table close to the surface, that shows up as damp air near the floor. It also shows up as condensation at the base of interior walls, and as flooring adhesives and finishes that fail early. We size equipment to the load the envelope actually creates. That's part of the same process that carries FORTIFIED Gold and the airtightness target into the finished house.
Check the community before your lot goes under contract.
Brunswick Forest publishes its own list of builders. So buying a lot there and choosing who designs and directs the house are linked decisions. Confirm with the community which builders it allows before a lot goes under contract. Magnolia Greens is organized around a golf course, with a homeowners' association that runs design review. Leland's code is the floor under both. The zoning table, the flood ordinance and the permit process reach every lot inside them. The community board adds a second layer on top.
Waterford of the Carolinas is 19 neighborhoods, each behind a privacy gate, connected by pathways and waterways that reach Osprey Lake. On a waterfront lot there, the setback and easement questions come first. Compass Pointe, also gated, is built around a golf course. Both run architectural review of their own. Dues and review turnaround differ between the four communities, and each association has the current figures.
Village Road, the corridor Leland grew from, still carries a mix of older houses, small commercial buildings and infill lots. These answer to the town's zoning table alone, with no ARC or covenant review. Belville keeps a separate council, a separate code and a separate permit counter. A parcel there follows Belville's process, even where the address reads as Leland. Past the town limits the rules change again. South down US 17 and NC 133, Winnabow is unincorporated county ground under Brunswick County's ordinance. East across the water, the city of Wilmington is where much of Leland commutes. It has its own city code, in New Hanover County. Across the river to the northeast, Castle Hayne has the same mix of older road frontage and newer rural growth. It falls under New Hanover County's code.
Inside a gate or on Village Road, construction is partner-executed under Tropical Tides' direction. We design and direct every project from Southport, about 40 minutes away on NC 87. We hold North Carolina Residential Contractor License #109520, belong to the Brunswick County Home Builders Association, and answer at 910-946-5512.
Nearby communities
Winnabow
Custom home builder in Winnabow, NC, for new homes and remodels. Send the address and we'll tell you your zoning district, its setbacks and your wind speed.
Custom home builder in Winnabow New Hanover CountyWilmington
Custom home builder in Wilmington, NC, for new homes and remodels. Send the address. We'll tell you which code, historic review and flood rule reach your lot.
Custom home builder in Wilmington New Hanover CountyCastle Hayne
Custom home builder in Castle Hayne, NC, for new homes and remodels. Send the address and we'll tell you your zoning, wind speed and any airport height limit.
Custom home builder in Castle HayneBefore you buy or build in Leland.
- Does the FlexCode apply to my Leland lot instead of the R-20, R-15 or R-6 table?
- Only if the town council has rezoned the parcel into a FlexCode Zone, marked on the official zoning map. Inside that zone, Chapter 30 (the FlexCode) replaces the conventional districts as the lot's zoning, with its own lot and building rules. A subdivision's name or age says nothing about it, so we check the zoning map with Planning & Inspections before a site plan is drawn.
- Which wind speed applies to my Leland lot, 140 mph or 150 mph?
- It depends on which side of US 17 the parcel sits. Table R301.2(4) of the 2018 North Carolina Residential Code splits Brunswick County at that highway. The lower figure applies to the west and the higher to the east. Because the road runs through Leland, one town holds both zones. A design professional confirms the figure for the parcel before the framing is drawn. Both numbers sit above 130 mph. At that speed, the code requires a house to be designed under one of the methods it lists. They include the WFCM, ICC 600, ASCE 7, the building code, and the residential code's own high-wind and coastal chapters (45 and 46).
- Do I need a town permit if I build inside a gated community in Leland, NC?
- Yes. Leland's zoning and building code governs every lot inside its limits, gated or not. A project needs a town-issued zoning-compliance certificate and a building permit, whatever a community's architectural review board approves. Inside a community such as Brunswick Forest, Magnolia Greens, Waterford or Compass Pointe, the town process runs alongside a private design review. That review has its own guidelines, submittal requirements and timeline, so it's the one to start early.
- What is the freeboard requirement near the Brunswick River or Sturgeon Creek?
- Where a lot has a base flood elevation established, the town's flood ordinance sets the regulatory flood protection elevation two feet above it. Where no base flood elevation has been established, the elevation is set at least two feet above the highest adjacent grade instead. Sections 26-30 and 26-32 of the town code set that. They work from the Brunswick County flood study of December 2019, and the map panels Leland adopts with it. Whether a specific lot along the Brunswick River or Sturgeon Creek carries a base flood elevation at all is a parcel-level fact. It's read off the current flood map for that parcel.
- Does building in Leland, NC ever require a CAMA permit?
- It can, and the town's paperwork assumes as much. Brunswick County is one of North Carolina's twenty coastal counties. Under Sec. 66-30, a zoning-compliance certificate application has to show the location of any applicable Area of Environmental Concern. Leland's building inspector serves as the local permit officer under the county's CAMA implementation plan. Leland has no ocean shoreline, so the ocean-hazard setbacks that govern the barrier-island towns do not apply here. What can reach a parcel instead is the estuarine shoreline designation along the Brunswick River and its tidal creeks. The NC Division of Coastal Management determines whether it reaches a particular lot.
- Can I build a detached ADU in Leland, NC?
- Possibly, and three things decide it. The zoning district comes first. Sec. 66-162 permits a detached accessory apartment in the R-20, R-15, R-6, PUD, RMH and multi-family districts. Sec. 66-229(b)(3) caps it at 35 percent of the house's lot coverage, or 1,200 square feet. It has to sit entirely behind the principal structure. It can be no taller than the main house or 35 feet, whichever is less. Utility service comes second, because a lot on well and septic carries different lot-size arithmetic than one on public water and sewer. The covenants come third and can be the binding constraint. A community's architectural guidelines can prohibit a second dwelling on a lot where the zoning code would allow one. Settle all three before a layout is drawn around one.
- My lot backs up to a subdivision stormwater pond. Does that limit what I can build?
- Usually, yes, in a defined way. Runoff here is managed at the scale of the whole subdivision, permitted as one system when the plat was recorded. That plat typically carries a maintenance easement and a setback from the water's edge. Those lines trim the buildable footprint on any lot touching the pond, and they come from the subdivision's recorded documents. The site analysis reads them off the recorded plat for that lot.
- Is my Leland lot on public water and sewer, or well and septic?
- Lots inside the master-planned communities are generally on public water and sewer. Brunswick Regional Water and Sewer, known locally as H2GO, serves Leland along with Navassa and Belville. Outlying and rural parcels beyond public service still rely on a private well and septic system. The town's zoning table accounts for that directly. Minimum lot size in the R-6 district is larger for a lot that isn't served by both public utilities. On those parcels, septic capacity can move the footprint. Confirm service for a specific address with H2GO before a design assumes either one.
Brunswick County
Brunswick runs from the Cape Fear River to the South Carolina line: a chain of barrier-island beach towns, river towns like Southport and Leland, and farmland and pine flatwoods inland, with the US 17 wind line splitting 140 mph from 150 mph through the county. An oceanfront lot on Oak Island and a wooded acre in Winnabow answer to different codes and different exposure, so the design starts from the parcel in hand.
View Brunswick Service areaNew Hanover County
New Hanover packs barrier-island exposure, tidal creek frontage, and established inland neighborhoods into the second-smallest county in the state. A home on the sound side of Wrightsville Beach and a home in a wooded Wilmington lot are answering different questions, and the design should start by asking which one it is.
View New Hanover Service areaPender County
Pender runs from Surf City and Topsail Beach on Topsail Island inland to Burgaw, the county seat, and the farm country along the Northeast Cape Fear River, with three wind zones on the way: 150 mph east of the Intracoastal Waterway, 140 in Topsail Township west of it, and 130 across the rest of the county. A beach house in Topsail Beach and a farmhouse outside Burgaw are built to different wind numbers, so the design starts from which one it is.
View Pender The standardHigh Performance
Airtightness, moisture, HVAC, indoor air quality, and coastal durability, with the targets stated and the verification named.
See the standardRegulatory and geographic statements on this page draw on the public sources below. Ordinances change; the parcel and the current adopted code decide, and the formal site analysis is where that gets confirmed for your lot.
- Town of Leland Code of Ordinances (Municode)
- Leland Code of Ordinances, Sec. 66-163: Area, yard and height requirements
- Leland Code of Ordinances, Sec. 66-30: Building permits
- Leland Code of Ordinances, Sec. 26-30: Flood Damage Prevention definitions
- Leland Code of Ordinances, Sec. 26-32: Basis for establishing the special flood hazard areas
- Town of Leland: Planning & Inspections
- NC DEQ: Division of Coastal Management
- 15A NCAC 07H .0209: Coastal Shorelines (NC DEQ)
- 2018 North Carolina Residential Code, Table R301.2(4)
- NC Flood Risk Information System (map portal)
- Brunswick Regional Water & Sewer (H2GO)
- Town of Leland: History
- Leland Code of Ordinances, Sec. 66-162: Permitted uses (accessory apartments, Note 28)
- Leland Code of Ordinances, Sec. 66-229: Accessory uses and structures
- Leland Code of Ordinances, Chapter 30: FlexCode
Tell us about your Leland site.
Every project begins with a formal site analysis of your specific parcel: flood zone, wind exposure, sun path, drainage, and the constraints that come with it. That document is yours, and it comes before any design decision.
Start Your Project