910-946-5512Sign InStart Your Project
Leland, Brunswick County, North Carolina

Custom home builder in Leland, North Carolina, across the river from Wilmington.

Watercolor of the Town of Leland welcome sign, framed by flower beds, shrubs and tall pines.

Send the address. We'll tell you how much house your zoning allows, plus your wind speed and flood zone.

Give us a phone number or an email. Either one works.

We read every address and reply by phone or email.

No site visit, no obligation.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

  • A forty-minute drive from Southport.

    Southport, our home base, is about 27 miles away on NC 87. We design and direct every project from there.

  • We read your graded lot.

    The grading plan was drawn for the whole subdivision. Before any floor plan, our written site analysis reads how water moves across your lot.

  • Built for wind and wet ground.

    Every home we design pursues FORTIFIED Gold. Our air-leak target, under 1.0 ACH50, controls where humid air moves. It is tested before handover.

Here's what Leland decides for your lot.

We build new homes and remodel existing ones in Leland, from our home base in Southport.

  • Where the map sets a flood height, the house must sit two feet above it.
  • On a rural lot with a well and septic, the septic can move where the house goes.
  • An attached apartment can be up to 800 square feet, and no more than 35 percent of the house's floor area.
At a glance
County
Brunswick County
Jurisdiction
Town of Leland. The town runs zoning, building permits, inspections and floodplain review.
Ultimate design wind speed
140 mph west of US 17, 150 mph east (2018 NC Residential Code).
Flood mapping
Checked lot by lot on the state's flood map system. The town uses the county's 2019 flood study.
Drive from Southport
About 27 miles, roughly 40 minutes, most directly via NC 87

Residential Contractor License #109520 · Member, Brunswick County Home Builders Association

Explore further

Tell us about your Leland site.

Every project begins with a formal site analysis of your specific parcel: flood zone, wind exposure, sun path, drainage, and the constraints that come with it. That document is yours, and it comes before any design decision.

Start Your Project