Attic conversions and bonus rooms
We turn the attic or bonus space your house already has into a room you can live in. We work in Brunswick, New Hanover and Pender Counties, from our home base in Southport.
Send the address. We'll look up the year it was built, its wind speed, and whether public sewer serves the area.
What you get when you finish the attic.
Your attic floor is built to be lived on.
Many attic floors are ceiling joists, sized for an attic no one lives in. A bedroom floor has to carry more. We check the framing first, and the plan makes it strong enough.
Your attic room gets a safe way out.
A finished attic needs a real stair and a window big enough to climb out of. The window sits low enough to reach from the floor.
Your new room is insulated against a hot roof.
Summer sun bakes an attic. A room up there needs the roof above it insulated and sealed like the rest of the house. The heating and cooling trade sizes the system for it.
A room in the attic starts with what's up there now.
A bedroom, an office or a playroom: each one needs a floor built for it, a real stair and a way out.
The assessment records the attic as it stands: the framing, the joists, the headroom and the way up. The drawings that come out of design are yours to keep. Your private online workspace keeps each choice on record, along with why you made it.
Three kinds of attic room
A bedroom
A bed up there brings the bedroom rules: an escape window, smoke alarms and, on a septic lot, the health department.
An office or a playroom
A real stair, a window to climb out of and a floor built for people. If guests will sleep there, we build it as a bedroom.
Space over the garage
Space already framed over an attached garage, finished as a room, with a fire separation in the garage ceiling below.
How an attic becomes a room
Measure and check
The framing, joists, headroom and way up, measured and recorded.
Design and permit
Drawn, engineered where the framing calls for it, and permitted. On a septic lot, the health department comes first.
Floor framing
Joists strengthened to the plan, and the subfloor laid.
Stair
The opening cut and framed, and the stair built in.
Escape window
A window big enough to climb out of, with its sill in reach.
Wiring and ducts
New circuits and ducts run to the room. Each is permit work.
Insulate and seal
The roof slope, the kneewalls and the top ceiling, insulated and air sealed.
Finish and inspect
Drywall, trim and floors, then the final inspection.
Your choices up there
- What the room is for: a bedroom, an office or a playroom
- Where the stair lands on the floor below
- A vented roof or a sealed one
- Heating and cooling from the system you have, a new zone or a unit for the room, as the load calculation allows
- Closets, and storage behind the kneewalls
- Lights, outlets and where the switches go
- Whether to seal the room to an airtightness target
Under the roof you have
We finish space inside the roof your house already has. A new floor built up over a garage wing is a second-story addition. Add a kitchen and its own door, and your town's rules for a second home on the lot can come into play. In-law suites and garage apartments cover that path.
Hidden damage is an allowance.
Old roof leaks and damaged framing can hide under attic insulation and flooring. Damage that only shows once the work opens it up is carried as an allowance in the price.
Older attics get two checks.
A house built before 1978 falls under North Carolina's lead-safe renovation rules. Old loose-fill insulation in an attic can hold asbestos. On an older house, that insulation and other suspect materials are tested by an NC-accredited inspector before the work disturbs them.
Staying home during the work
Whether you stay home depends on the size of the job, and we settle it for each project. A large one may require moving out. A smaller one may be finished while you stay in the house. Living through it shows how work is planned around a household.
Your attic's floor and headroom decide what it can be.
Whether an attic can become a room starts with the joists under it and the headroom over it.
- Code in force
- The North Carolina Residential Code. New work meets the rules for new construction, and the existing house can stay as built if the work leaves it safe (Section R102.7.1)
- Live load
- Joists under an attic with no storage are designed for 10 pounds per square foot, or 20 with limited storage. A habitable attic or a bedroom gets 30 (Table R301.5)
- Room size
- At least 70 square feet, and 7 feet across in every direction. Under a sloped ceiling, at least half of that needs 7 feet of headroom (Sections R304, R305)
- Building permit
- Needed at any cost once the work strengthens the floor framing or adds wiring, heating or cooling (G.S. 160D-1110)
- Design wind speed
- Brunswick and New Hanover: 140 mph west of US 17 and 150 mph east of it. Pender: 130 mph, apart from Topsail Township at 140 west of the Intracoastal Waterway and 150 east (Table R301.2(4))
Your ceiling joists become a floor.
Many attic floors are ceiling joists. They were sized to hold up a ceiling, under an attic no one lives in. A floor that people sleep, work and play on is designed for a heavier load. So the joists often need strengthening to the plan, with added or deeper joists or a new beam. Where they would run past the span tables in the code, they are engineered.
Headroom is counted by the floor under it.
A room up there needs at least 70 square feet of floor. Under a sloped ceiling, at least half of that needs a 7-foot ceiling. Floor where the ceiling drops below 5 feet doesn't count toward the room's size. So a steep roof with a tall peak leaves more usable room than a low, shallow one.
Stand at the middle of your attic, under the peak. How much of the floor around you has room to stand up straight?
The roof's wind ties cross the room.
Where the code's coastal rule for roof ties applies, as in the 150 mph zone, the roof is braced from inside the attic. A board runs down from the middle of every third rafter, at most 4 feet apart, to the ceiling joists below. Near the peak, a collar or wind beam ties the rafters together. Those boards stand in the space your room will fill, so where they land shapes the layout. The code also accepts an equal or better way to tie the house together, designed for that house by an engineer or architect.
Plan on a permit.
State law exempts some jobs of $40,000 or less from the building permit, when the work meets code. An attic finish rarely fits that exemption. Strengthening floor joists is load-bearing work, and new wiring, heating or cooling falls outside it too. Your town's zoning or a historic district can have a say as well.
Your town may count the attic.
| Town | What it decides for a finished attic |
|---|---|
| Caswell Beach | An attic with 7 feet of clear height over more than half the width of the floor below counts as a story. Houses are capped at two stories. Heated space also counts toward the 5,400-square-foot cap on house size in its residential districts. |
| Wrightsville Beach | Attics with 5 feet or more of headroom count toward the floor area limit (a ratio of 0.7), floored or not. So an attic tall enough to finish is already in the count. |
| Southport | In the local historic district, a new window or any other change to the outside needs a certificate of appropriateness before the building permit. Work inside needs none. |
| Wilmington | Exterior work in a local historic district, or work seen from the street in a historic overlay, goes to the Historic Preservation Commission first. Interior work stays out of its review. |
On the oceanfront
On an oceanfront lot, the state counts heated living space when it sets how far back from the ocean a house must sit. A finished, heated attic joins that count. On those lots, it's a question for a permit officer under the state's coastal law (CAMA) first.
In a flood zone
In a mapped flood zone, the framing, finishes and systems of an attic finish count toward your town's 50 percent rule. So does other work done in the town's counting window.
Every attic room needs a stair and a way out.
A real stair gets you up and down each day. A window big enough to climb out of is the way out in an emergency.
- Stair
- At least 36 inches wide, with risers no taller than 8 1/4 inches and treads at least 9 inches deep. Headroom of 6 feet 8 inches, and a floor or landing at the top and bottom (Section R311.7)
- Escape window
- At least 4 square feet of clear opening, 22 inches high and 20 inches wide. Upstairs, it also needs 5.7 square feet of glass, and its sill sits no more than 44 inches above the floor (Section R310.2)
- Alarms
- Permitted work brings every smoke alarm in the house up to new-house placement, with one on the attic level. Carbon monoxide alarms follow the same rule (Sections R314.2.2, R315.2.2)
- Septic
- Sized at 120 gallons a day per bedroom. A new bedroom on a septic lot goes to the county health department before the building permit (15A NCAC 18E)
The stair needs room on the floor below.
A stair to the attic needs a run of floor on the level below, headroom over every step and a landing at each end. In a house with 8-foot ceilings, even the steepest straight stair the code allows runs about 9 feet across the floor. That space comes out of a hall, a closet or part of a room. Where would yours land?
A spiral stair is allowed where the plan is tight. A ship's ladder can't serve as the room's way down.
Every attic room gets a window to climb out of.
The code asks for an escape opening in every bedroom and every habitable attic, its name for a finished attic room. Under a roof, the sill height is the hard part, since it can sit no more than 44 inches above the floor. A gable end wall is the usual place for a window that low. So where that window can go helps decide what the attic can become.
East of the Intracoastal Waterway, a new window also needs protection from wind-blown debris. Impact windows and doors covers the ratings.
If guests sleep there, it's a bedroom.
An office or a playroom up there already gets the escape window and a smoke alarm on the attic level. A room someone sleeps in also needs an alarm inside it, and on a septic lot, the health department has a say. If anyone will sleep up there, guests included, we build it to the bedroom rules from the start.
On septic, the health department comes first.
Septic rules count bedrooms, and each one adds 120 gallons a day to what the system must handle. So an attic bedroom on a septic lot needs the county health department to approve the system for it. That application comes before the building permit. Many lots around Rocky Point and Boiling Spring Lakes use septic. On sewer, as across Oak Island, the step drops away.
A room over the garage
The garage ceiling under the room becomes a fire separation. For a room over a garage, the code's table calls for 5/8-inch Type X drywall there. In a house built before 2012, existing drywall at least 1/2 inch thick is accepted there, with taped joints. No door may open from the garage straight into a bedroom. Ducts through that ceiling are sheet steel, with no openings into the garage. The stair comes up from inside the house, since the way out may not pass through the garage.
A finished attic is insulated at the roof.
A room up there moves the insulation and the air seal from the attic floor up to the roof.
The insulation moves up to the roof.
Today your insulation likely lies on the attic floor, and the attic above it bakes. A room up there moves the insulated, sealed edge of the house to the roof slope, the kneewalls and the ceiling at the top. For a converted attic, the state's energy rules call for R-30 or more in the ceilings. The walls get the level set for outside walls (Section N1109.1.1).
A vented roof or a sealed one
A vented roof keeps an air channel between the insulation and the roof deck, so outside air can carry heat and damp away. A sealed roof puts the insulation right against the underside of the deck and brings the whole attic inside the house (Section R806.5). On a hot, humid coast, that choice shapes the rest of the insulation plan, and we make it with you.
Moisture management covers how a coastal house drains and dries. Our article on moisture planning before year eight follows damp through an older house.
Kneewalls are closed in on the attic side.
Behind a kneewall sits a strip of leftover attic, hot in summer. The wall's insulation gets a rigid sheet or an air barrier on that attic side (Section N1102.2.15). Storage doors through the kneewall are weatherstripped and insulated (Section N1102.2.4).
A tenth of the cost goes to the energy code.
Finishing an attic turns unheated space into part of the house. Once that job costs more than $10,000, a tenth of its cost is spent on meeting the energy code (Section N1109.2).
Heating and cooling sized for the room
Heating and cooling is a permitted trade in North Carolina, like wiring and plumbing. The HVAC trade sizes the system from a load calculation for the house with the new room in it. It installs the work under its own permit. That math picks between the system you have, a new zone or a unit for the room. The code also bars added rooms from overloading the old system.
If the air handler lives in the attic now, the room keeps a clear path to it and space to work on it. Right-sized systems explains how sizing keeps the air dry.
Questions about attic conversions
- Can my attic be turned into a room?
- Often, if it has the headroom and the floor can be made strong enough. A finished attic needs at least 70 square feet with legal headroom, a real stair and a window to climb out of. The joists often need strengthening. The assessment measures what is up there before anything is drawn.
- Will my ceiling joists hold a floor?
- Probably not as they are. Ceiling joists under an attic with no storage are designed for 10 pounds per square foot of live load. A habitable attic or a bedroom is designed for 30. So the joists are often strengthened or added to, and joists past the span tables in the code are engineered.
- How much headroom does an attic room need?
- A room needs at least 70 square feet of floor and must be at least 7 feet across in every direction. Under a sloped ceiling, at least half of that 70 square feet needs a 7-foot ceiling. Floor where the ceiling drops under 5 feet doesn't count toward the room's size.
- What kind of stair does an attic room need?
- A fixed stair, at least 36 inches wide, with risers no taller than 8 1/4 inches and treads at least 9 inches deep. It needs 6 feet 8 inches of headroom over every step. A spiral stair is allowed. A ship's ladder can't serve as part of the way out of the room.
- Does an attic room need an egress window?
- Yes. The code asks for an escape opening in every bedroom and every habitable attic. Upstairs, a window needs at least 4 square feet of clear opening and 5.7 square feet of glass. Its sill can sit no more than 44 inches above the floor. East of the Intracoastal Waterway, a new window also needs debris protection.
- Do I need a permit to finish my attic?
- In practice, yes. State law lets some jobs of $40,000 or less skip the building permit when they meet code. Strengthening floor joists is load-bearing work, and new wiring, heating or cooling falls outside that exemption too. In a Southport or Wilmington local historic district, a new outside window also goes to the commission first.
- What insulation does a finished attic need?
- North Carolina's energy rules call for R-30 or more in the ceilings of a converted attic. Its walls are insulated to the level for outside walls. Kneewalls get a barrier on their attic side, and their doors are weatherstripped and insulated. Once the job passes $10,000, a tenth of its cost goes toward the energy code.
- Will my heating and cooling handle the new room?
- A load calculation decides, for the house with the room in it. The HVAC trade sizes the system and installs it under its own permit. The answer may be the system you have, a new zone or a unit for the room. The code bars the new room from overloading the old system.
- Does an attic bedroom affect my septic system?
- Yes, on a septic lot. North Carolina sizes septic systems at 120 gallons a day per bedroom, so a new bedroom adds to what the system must carry. The county health department has to approve it, and that application comes before the building permit. A house on sewer skips the step.
- Can an office up there double as a guest room?
- Yes, when it is built as a bedroom. Every finished attic gets the escape window and a smoke alarm on its level. A room someone sleeps in also needs an alarm inside it, and on a septic lot, the health department must approve it. If guests will sleep there, we build it to the bedroom rules from the start.
- What changes when the attic is over the garage?
- The garage ceiling under the room becomes a fire separation, and the code's table calls for 5/8-inch Type X drywall there. In a house built before 2012, existing drywall at least 1/2 inch thick is accepted there, with taped joints. No door may open from the garage straight into a bedroom. Ducts through that ceiling are sheet steel. The stair lands inside the house. A new floor built over a garage wing is a second-story addition.
- Can we stay in the house while you finish the attic?
- That depends on the size of the job, and we settle it for each project. A large attic conversion may require moving out. A smaller one may be finished while you stay in the house. The stair, the wiring and the ducts reach the floor below, so some of the work happens downstairs too.
More renovation projects.
Regulatory figures on this page summarize the town and county codes each linked city page cites, and the public sources below. Ordinances change; the parcel and the current adopted code decide, and the site analysis confirms both for your lot.
- 2018 North Carolina Residential Code: Sections R102.7.1, R301.1.3, R301.2.1.2, R301.5, R302.5, R302.6, R304, R305, R310, R311.1, R311.7, R314.2.2, R315.2.2, R806.5, R4605, M1202.1, M1305.1.3, M1401.3, N1102.2.4, N1102.2.15, N1109.1.1 and N1109.2 (ICC Digital Codes)
- N.C. General Statutes § 160D-1110, building permits
- N.C. General Statutes § 160D-947, certificates of appropriateness
- 15A NCAC 18E .0401, design daily flow (N.C. Office of Administrative Hearings)
- 15A NCAC 18E .0202, applications for existing systems (N.C. Office of Administrative Hearings)
- 15A NCAC 07H .0306, general use standards for ocean hazard areas (N.C. Office of Administrative Hearings)
- Caswell Beach Code of Ordinances § 153.002, definitions (American Legal)
- Caswell Beach Code of Ordinances § 153.086, built-upon area and bulk size (American Legal)
- Wrightsville Beach Code of Ordinances, Section A.3, definitions (American Legal)
- Wrightsville Beach Code of Ordinances, Section 155.7.17, floor area ratio (American Legal)
- FEMA P-758, Substantial Improvement/Substantial Damage Desk Reference
- U.S. EPA, Protect your family from asbestos-contaminated vermiculite insulation
Make the attic part of the house.
Tell us where the house is and what you want up there. We'll start with the year it was built, its wind speed, and whether public sewer serves the area.