910-946-5512Sign InStart Your Project
Hampstead, Pender County, North Carolina

Custom home builder in Hampstead, North Carolina.

Send the address. We'll tell you your flood zone and wind speed, sound side or wooded side.

Give us a phone number or an email. Either one works.

We read every address and reply by phone or email.

No site visit, no obligation.

Rather talk? Call 910-946-5512.Residential Contractor License #109520

  • Southport is 51 miles away.

    It's our home base, a drive of about 65 minutes. We design and direct your Hampstead project from there.

  • Sound side or wooded side.

    Before any drawing, our written site analysis reads your side. By the sound, it means flood and marsh. Inland, it means septic and shade.

  • Built for wind across the sound.

    We pursue FORTIFIED Gold on every home we design, and many insurers recognize it. Our air-leak target is under 1.0 ACH50, tested before handover.

Here's what the rules decide for your Hampstead lot.

We build new homes and remodel existing ones in Hampstead, from our home base in Southport.

  • Where the county's flood rule applies, a new house must sit two feet above the map's flood height.
  • On a wooded lot, the septic review often shapes where the house goes as much as the setbacks.
  • An ADU is one per lot, no more than 33 percent of the house's heated floor area.
At a glance
Jurisdiction
Pender County. Hampstead is unincorporated, so the county's Unified Development Ordinance applies.
Permit counter
Pender County's Hampstead Annex on US 17. The county offices in Burgaw have one too.
Design wind speed
140 mph on Hampstead's mainland, in Topsail Township west of the Intracoastal Waterway. 150 mph east of the waterway. 130 mph in the rest of Pender County (2018 NC Residential Code).
Flood maps
FEMA's current map panel, or the state's Flood Risk Information System. We check each parcel.
Drive from Southport
About 51 miles, 65 minutes, via NC 87, US 17 and the Wilmington Bypass

Residential Contractor License #109520 ยท Member, Brunswick County Home Builders Association

Explore further
References

Regulatory and geographic statements on this page draw on the public sources below. Ordinances change; the parcel and the current adopted code decide, and the formal site analysis is where that gets confirmed for your lot.

Tell us about your Hampstead site.

Every project begins with a formal site analysis of your specific parcel: flood zone, wind exposure, sun path, drainage, and the constraints that come with it. That document is yours, and it comes before any design decision.

Start Your Project